ENTEGRA - Barcelona, Spain
Project Information
- Building Type: Commercial Offices
- Construction type: New
- Developer OCP – Obra Civil Profesional
- Façade contractor: ACIEROID
- Glass processor: Glassolutions Lalín
- Photos: ©Oriol Gomez
- Label & Award: LEED Gold
Products
| COOL-LITE® XTREME 70/33 | COOL-LITE® XTREME 60/28 |
Description
The Oficinas Entegra is a landmark low-carbon office building that integrates abundant greenery while promoting sustainable mobility and user comfort. Located on a chamfered corner in Barcelona’s tech district, its design reflects the distinctive geometry of the Cerdà grid. The building features a welcoming, open-plan ground floor that connects seamlessly with the block’s public spaces, topped by eight floors of modern office areas.
The façade incorporates two advanced glazing solutions from the COOL-LITE® XTREME range, offering outstanding selectivity to ensure abundant daylight, excellent solar control, and year-round thermal comfort. With light transmission of up to 70% while blocking 67% of solar heat, this glazing reduces reliance on artificial lighting and air conditioning, significantly improving the building’s energy performance.
Beyond performance, the glass’s neutral aesthetics complement the contemporary architectural language of the Oficinas Entegra, making it a benchmark for sustainable office design in Barcelona.
Related products
COOL-LITE® XTREME 70/33 & 70/33 II
COOL-LITE® XTREME 70/33 and COOL-LITE® XTREME 70/33 II, respectively the annealed and to-be-tempered version of the product are the most transparent and neutral triple silver coating, bringing ample natural light into buildings while blocking two thirds of solar heat.